Saturday 7 July 2012

Mid-Review (Energy Group - Camposampiero)

On this step, we started the analysis based on the logics of the territory and proposing a new structure for testing the new technics in the territory.
















The group has started testing different possibilities for producing energy based on the results coming from the analysis from the previous previous step:







In parallel, we are trying to integrate a new non-physical smart grid in order to collect all the information from micro to macro scale in order to:
first, reduce the energy loss and consumption
second, a better management on the production and distribution of energy.

























No comments:

Post a Comment