On the final effort the group started from the the analysis we made on the last steps.
As it can be seen in the following map, we are in the adjacent of the homogeneous roman grid.
The following slide shows the position of Camposampiero in the territory.The main questions of the group...!!!
The analysis of the existing situation in terms of landscape logics.
Testing the possibilities of energy production in the territory.
The vision of energy production in the site.
The total consumption statistics in the territory.
The total considered energy production based on the possibilities.
The group is also predicting a smart grid in order to collect all the information and reduce the consumption in the first step and redistribute and store the energy in the most efficient way.
A vision of energy network for Europe 2050.
How can we do it...!?
The vision of the group.
Considering different areas with different characteristics to test the vision.
Test 1
Test 2
Playing with the model
No comments:
Post a Comment